Loading…
Hiring an external PCB layout engineer provides immediate physical design capacity when your engineering team is focused on architecture and schematic capture. Wesley Jones delivers complete board designs from netlist intake to verified CAM release, communicating directly in your time zone with zero offshore handoffs.
The Role
You engage one dedicated principal layout engineer for your board. Wesley Jones handles stackup modeling, component placement, transmission line routing, DFM verification, and CAM packaging, maintaining direct peer-to-peer technical communication from kickoff through fabrication release.
The scope is strictly physical design. Circuit schematics, topology decisions, embedded firmware, and enclosure mechanicals remain owned by your team. When physical routing reveals electrical or mechanical conflicts, you receive documented engineering feedback detailing the exact nets, clearance limits, and stackup constraints involved.
Our layout envelope spans simple 2-layer sensor modules up to 2-12 layers for standard work and up to 40 layers for backplanes and dense HDI, with layer counts and dielectric materials verified during initial intake.
The engineering scope behind the role is described on the Netlist-to-Gerber Layout and Services pages.
Fit
Hardware startups with schematics ready but no internal PCB CAD seat. Engineering consultancies needing quick stackup validation before machining enclosures. Enterprise teams looking to clear peak routing backlog without adding permanent overhead. These represent our primary engineering partnerships.
Unlike broad design bureaus burdened by account management tiers and large retainer minimums, Veribus Design provides direct access to the engineer executing the work, delivering fabrication-ready boards on a fixed schedule.
Starting
Specify pin count, layout tier, and delivery timeframe in our online quote tool. The calculator returns an immediate, binding fixed fee itemizing all parameters, allowing technical discussions to focus on board requirements rather than billing negotiation.
During technical intake, we audit the schematic, netlist, mechanical models (STEP/DXF), component datasheets, and interface requirements. The Statement of Work locks the scope, deliverables, and review schedule before any engineering work commences.
The onboarding sequence and its review gates are on the PCB layout process page; the equipment and interface envelope is on PCB layout capabilities.
Rates
Pricing is calculated from published per-pin rates based on the required service tier, subject to our published minimum project fee. There are no variable hourly rates, no unbudgeted fees, and quotes remain valid for 30 days.
Quotes are valid for 30 days.
Expedited turnaround options are quoted as explicit, itemized lines so schedule compression costs are known upfront. Minor corrections inside agreed milestone scopes are included; substantial architectural revisions proceed via written Change Orders.
The same engineer leads layout through final sign-off and provides technical support when questions arise during board fabrication and assembly.
The full rate card is on the PCB layout pricing page, and the fee is fixed once the statement of work is signed.
FAQ
Send the layer count, the interfaces and the date. We confirm the scope and return a fixed fee within one business day.