Handoff guide

What to send a layout engineer on day one

Most layout delays start with the handoff, not the routing. A complete package takes an afternoon to assemble and saves a week of questions. Here is the list we ask for, and the cost of leaving each item out.

The package

The six items that make a handoff complete

Everything below is something the layout depends on. If an item is genuinely undecided, say so and mark it as an assumption; an open question is manageable, a silent gap is not.

Handoff inputs, what good looks like, and what goes wrong without them.
InputWhat good looks likeCost of leaving it out
Schematic and netlistNative Altium project, or an export with a complete netlistConnectivity ambiguity; nets get guessed and rework follows
Mechanical outlineDimensioned DXF plus a 3D STEP of the enclosure and mating partsConnector or height collisions found after routing
BOMCurrent BOM with reference designators and manufacturer part numbersFootprint guesses, wrong pad geometry, assembly defects
ConstraintsImpedance targets, length windows, current, isolation and thermal limitsRules invented by the layout engineer instead of taken from your design
Stackup and fab dataPreferred layer count, materials, finish, or the fab's own stackupA board that has to be re-impedanced after the quote
Interface listInterface names, target speeds and the controller or PHY part numbersConstraint set built on a guess about which bus is fast

Constraints

What a usable constraint is

A constraint the layout can act on has a number, a net class and a source. "Keep DDR short" is not a constraint; a 6.25 ps DQ-to-DQS allowance applied to each byte lane, taken from the controller datasheet, is.

Where the datasheet gives a fraction of the unit interval, hand over the fraction and the data rate and let the length window be computed. Where the vendor supplies a layout guide, send it: it usually contains the exceptions that matter more than the general rule.

  • Impedance targets per net class, with the stackup they assume
  • Length and skew windows per match group, and the fixed terms to deduct
  • Current and voltage isolation requirements, including creepage where relevant
  • Thermal limits for power components and the ambient they see
  • Any net, part or area that must not move, and why

The DDR length matching turns a timing allowance into length windows you can put straight into a constraint manager.

Pitfalls

Four habits that stall a layout

These are the ones we see most often, and each one costs days rather than hours.

  • Sending a 2D outline without 3D models for tall or custom parts, then discovering the collision at the first review.
  • Updating the schematic mid-placement without an ECO summary, so the netlist and the board drift apart.
  • Leaving the stackup to the layout engineer when the fab has already quoted a different one.
  • Withholding the vendor's layout guide for a processor or PHY because it is long; the escape and via rules in it are usually the difference between working and marginal.

Our our onboarding process covers the same inputs from the commercial side, including when the NDA has to be signed relative to the file transfer.

FAQ

Common questions

It can start, and it will have to be redone. Without a mechanical outline the placement is a guess; without a stackup the impedance rules are nominal; without constraints the fast nets are routed to whatever the tool defaults to. A partial package produces a partial first pass, and the rework is billed either way.